The chairman of the board has wanted to remodel our kitchen for a long time. We both agreed that we didn’t like where the stove was located but couldn’t decide where to put it and the refrigerator. For a while I stalled by declaring, ” I am studying the problem.” It worked for a for a period of time, but then she let me know that she expected action.

At a moment of inspiration, we figured out the optimum appliance configuration. Then the chairman of the board decided to manage the project herself. She picked a contractor, bought appliances and picked out flooring, paint colors, light fixtures back splashes, counter tops and a sink. We are keeping our old cabinets.
When the contractor told her he could start in October I was happy. I was hoping that the job would be done when I got back from Mexico Nov 8. That didn’t happen. They started Dec 6 and are well along in the process. For the duration of the project, our kitchen is in the garage. We are getting water from a bucket and flipping waste water into the yard. Kitchen items and the contents of 3 closets are scattered around the house. Our house will be in disarray over Christmas. It looks like January 4th is the earliest that we can expect the counter installation. It is pretty chilly when we make our toast in the morning.
I always appreciate your stories, Paul. This one made me chuckle for sure as we were in similar circumstances not long ago, where our kitchen was relocated to our dining room and our new kitchen cabinets took up our entire living room. This was the status for several months. I’m happy to say that we eventually finished the projection (we meaning Peter) and I have a lovely new kitchen.
LikeLike